Real Local Jobs

Our Work — Before & After

Drag the sliders to see the difference proper EPDM rubber roofing, warm roof insulation and Fortex cladding make.

Completed dormer with grey cladding, warm roof and new windows
Weathered dormer before warm roof conversion
BeforeAfter

1. Warm Roof Conversion, Full Dormer Insulation & Face Lift

Complete dormer makeover: warm roof conversion, full dormer insulation, grey Fortex-style cladding, crisp white fascias/gutters and new windows.

New EPDM rubber dormer roof converted to front drainage
Cold dormer flat roof holding standing water and moss
BeforeAfter

2. Cold Dormer Roof — Standing Water & Drainage Fix

This dormer roof was holding deep standing water and moss. We stripped it back, re-laid it in seamless EPDM rubber and converted it from a rear drainer to clean front drainage.

3. Premium Roof Lantern Installations

From tired, ponding flat roofs to bright, watertight EPDM roofs with architectural lanterns.

Roof lantern installation photo 1Roof lantern installation photo 2Roof lantern installation photo 3

4. Complete Rebuild & Refurb (8-Stage Story)

When a flat roof has leaked for too long and the timber structure has collapsed, a simple re-cover isn't enough. Here is a full strip-out, structural timber rebuild and cladding facelift from start to finish.

Stage 1: The problem: a failing felt roof
Stage 1

The problem: a failing felt roof

Old mineral felt sagging and splitting over the side extension, with the edge bowing, gutter full of leaves and debris, and cracked, crumbling render below where water has been running down the wall for years.

Stage 2: Felt lifted: rotten deck revealed
Stage 2

Felt lifted: rotten deck revealed

Once the felt was cut back, the chipboard deck underneath was black, soft and delaminating from long-term water ingress. Board in this state can't hold a fixing, let alone a new roof.

Stage 3: Breaking through the old deck
Stage 3

Breaking through the old deck

Lifting the boards showed the timbers had rotted right through to the edges, with daylight into the room below. At this point a re-cover isn't an option; the structure has to come out.

Stage 4: Full strip-out to the walls
Stage 4

Full strip-out to the walls

The whole roof removed back to the masonry, leaving the walls, door and window openings exposed so every bit of rotten timber can be found and taken away.

Stage 5: Rotten wall plates and timbers exposed
Stage 5

Rotten wall plates and timbers exposed

A close look at the old wall plates and joist ends showed soft, crumbling timber that had been soaking up water for years. All of it was replaced rather than patched.

Stage 6: New treated joists going in
Stage 6

New treated joists going in

Fresh pressure-treated joists fixed across the walls on a new frame, set with a proper fall for drainage, ready for a solid new deck and roof covering.

Stage 7: Fortex cladding and new roofline
Stage 7

Fortex cladding and new roofline

The extension wrapped in dark grey Fortex-style vertical cladding, with new fascia, white trim and gutter, transforming the tired rendered walls.

Stage 8: Before and after
Stage 8

Before and after

Top: the original leaking, cracked extension. Bottom: the finished job, a fully rebuilt, watertight structure with cladding, new roofline, downpipe and new French doors.

Large Job Walkthrough Video

Recently completed large EPDM rubber roof installation.

Request a Quote
Text TimEmail Us